With the floor and walls completed, it was time to bring in the heavy infrastructure that will vent the room. Two new hoods are being installed to vent the ovens and the new dishwasher. From all the prep work done on them while on the floor to bolting them in place was one heavy lift!
0 Comments
Leave a Reply. |
Back to the OSLC Website
Archives
March 2022
Categories |